Keyphrases
Manufacturing Systems
48%
Control Policy
40%
Preventive Maintenance
37%
Total Production Maintenance
34%
Production Control
32%
Production Rate
31%
Backlog
26%
Production Planning
23%
Deteriorating System
23%
Optimality Conditions
23%
Failure-prone Manufacturing System
23%
Production Policy
23%
Sensitivity Analysis
22%
Control Problem
22%
Numerical Examples
21%
Maintenance Rate
18%
Remanufacturing
18%
Corrective Maintenance
17%
Optimal Control Strategy
17%
Failure-prone
17%
Controller
16%
Optimal Production
15%
Hedging Point Policy
15%
Joint Production
14%
Maintenance Scheduling
13%
Unreliable Manufacturing System
13%
Decision Variables
13%
Tagout
13%
Lockout
13%
Failure Rate
13%
Numerical Methods
12%
Electro-hydraulic
11%
Hamilton-Jacobi-Bellman Equation
11%
Age-dependent
11%
Optimal Policy
11%
Hybrid Manufacturing-remanufacturing System
11%
Replacement Policy
10%
Inventory Level
10%
Infinite Planning Horizon
10%
Demand Rate
10%
Random Repair Time
10%
Product Returns
9%
Exoskeleton Robot
9%
Part Type
9%
Imperfect Repair
9%
Single Product
9%
Product Manufacturing
9%
Electro-hydraulic Servo System
9%
Inventory Cost
9%
Maintenance Strategy
8%
Engineering
Gas Fuel Manufacture
100%
Preventive Maintenance
40%
Policy Control
39%
Joints (Structural Components)
38%
Remanufacturing
33%
Optimal Control
29%
Optimality
27%
Production Planning
25%
Numerical Example
23%
Illustrates
21%
Corrective Maintenance
20%
Production System
16%
Decision Variable
16%
Design of Experiments
14%
Optimal Policy
13%
Failure Rate
12%
Optimal Control Problem
12%
Part Type
12%
Numerical Method
12%
Dynamic Programming
12%
Inventory Level
12%
Maintenance Planning
12%
Stochastic Dynamic
11%
Active Suspension
11%
Sliding Mode Control
11%
Maintenance Strategy
10%
Planning Horizon
10%
Closed Loop
10%
Response Surface Methodology
10%
Product Manufacturing
9%
Flexible Manufacturing System
8%
Servo System
8%
Random Failure
8%
Experimental Result
8%
Road
8%
System Parameter
7%
Quality Control
7%
Position Control
7%
Experimental Design
7%
Nonlinearity
7%
Returned Product
7%
Simulation Result
6%
System Capacity
6%
Rate Control
6%
Exoskeleton (Robotics)
6%
Adaptive Control
6%
Repair Time
5%
Feedback Linearization
5%
Suspension System
5%