A distributed permutation flow-shop considering sustainability criteria and real-time scheduling

Résultats de recherche: Contribution à un journalArticle publié dans une revue, révisé par les pairsRevue par des pairs

52 Citations (Scopus)

Résumé

Recent advancements in production scheduling have arisen in response to the need for adaptation in dynamic environments. This paper addresses the challenge of real-time scheduling within the context of sustainable production. We redefine the sustainable distributed permutation flow-shop scheduling problem using an online mixed-integer programming model. The proposed model prioritizes minimizing makespan while simultaneously constraining energy consumption, reducing the number of lost working days and increasing job opportunities within permissible limits. Our approach considers machines operating in different modes, ranging from manual to automatic, and employs two real-time scheduling strategies: predictive-reactive and proactive-reactive scheduling. We evaluate two rescheduling policies: continuous and event-driven. To demonstrate the model's applicability, we present a case study in auto workpiece production. We manage model complexity through various reformulations and heuristics, such as Lagrangian relaxation and Benders decomposition for initial optimization as well as four problem-specific heuristics for real-time considerations. For solving large-scale instances, we employ simulated annealing and tabu search metaheuristic algorithms. Our findings underscore the benefits of the predictive-reactive scheduling strategy and the efficiency of the event-driven rescheduling policy. By addressing dynamic scheduling challenges and integrating sustainability criteria, this study contributes valuable insights into real-time scheduling and sustainable production.

langue originaleAnglais
Numéro d'article100598
journalJournal of Industrial Information Integration
Volume39
Les DOIs
étatPublié - mai 2024

SDG des Nations Unies

Ce résultat contribue à ou aux Objectifs de développement durable suivants

  1. SDG 12 – Consommation et production durables
    SDG 12 – Consommation et production durables
  2. SDG 17 – Partenariats pour la réalisation des objectifs
    SDG 17 – Partenariats pour la réalisation des objectifs

Empreinte digitale

Voici les principaux termes ou expressions associés à « A distributed permutation flow-shop considering sustainability criteria and real-time scheduling ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.

Contient cette citation