The IPD Contract Methodology as a Strategic Element in the Management of Building Projects

Résultats de recherche: Chapitre dans un livre, rapport, actes de conférenceParticipation à un ouvrage collectif lié à un colloque ou une conférenceRevue par des pairs

Résumé

The Integrated Project Delivery (IPD) strategy subsidises the financial, deadline and quality performance expected from the project. Its managerial processes and contractual requirements directly influence the productivity obtained in the project because the lack of understanding of these factors is interpreted as one of the main cause-effect factors associated with the low success of IPD implementation, resulting in stakeholders’ non-adherence to the final product's objectives. Building Information Modeling (BIM) in construction has been proposed as a technological solution to enhance information integration and collaboration throughout the processes in the IPD strategy. Thus, this article seeks to clarify how to develop the IPD strategy for the integrated management of construction projects and what challenges are arising. The question was addressed through a Systematic Literature Review. The sequencing of activities for the development of IPD was identified. The main challenges encountered were associated with the implementation process, the laborious and intense process of the integrated management required, and the disciplined integration with the cost of the work. However, the IPD for project management proves to be viable, pointing out benefits in the provision of guidelines for optimising the traditional process of project delivery, bringing solutions to most of the problems inherent in the conventional method, besides contributing to the reduction of rework through interoperability, integration of communication systems and anticipation of constructive decisions, promoting a favourable scenario for improving BIM technology uses.

langue originaleAnglais
titreAdvances in Information Technology in Civil and Building Engineering - Proceedings of ICCCBE 2024 - Volume 1
Sous-titreModeling and Scheduling
rédacteurs en chefAdel Francis, Edmond Miresco, Silvio Melhado
EditeurSpringer Science and Business Media Deutschland GmbH
Pages425-444
Nombre de pages20
ISBN (imprimé)9783031842078
Les DOIs
étatPublié - 2025
Evénement20th International Conference on Computing in Civil and Building Engineering, ICCCBE 2024 - Montreal, Canada
Durée: 25 août 202428 août 2024

Série de publications

NomLecture Notes in Civil Engineering
Volume628 LNCE
ISSN (imprimé)2366-2557
ISSN (Electronique)2366-2565

Conférence

Conférence20th International Conference on Computing in Civil and Building Engineering, ICCCBE 2024
Pays/TerritoireCanada
La villeMontreal
période25/08/2428/08/24

Empreinte digitale

Voici les principaux termes ou expressions associés à « The IPD Contract Methodology as a Strategic Element in the Management of Building Projects ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.

Contient cette citation