Keyphrases
4D Simulation
25%
Activity Duration
12%
Activity Type
12%
Blocking Zone
12%
Building Construction Sites
25%
Building Information Modeling
16%
Building Projects
39%
Carpet
12%
Chronogram
20%
Closed Room
12%
Congestion
16%
Construction Industry
35%
Construction Operations
18%
Construction Phase
22%
Construction Projects
12%
Construction Site
83%
Construction Stage
20%
Coordination Modes
12%
Evaluation Criteria
12%
Finishing Work
20%
Five-level
12%
Last Planner
16%
Lean Manufacturing
16%
Margin Computation
25%
Occupancy
29%
Occupancy Rate
93%
Occupation Rate
25%
Operation Flow
16%
Operation Process
16%
Optimism-pessimism
12%
Overlap Ratio
12%
Project Duration
12%
Real Conditions
12%
Risk Level
12%
Scheduling Method
14%
Site Occupancy
33%
Site Occupation
25%
Space Division
20%
Space Management
33%
Space Occupation
14%
Space Planning
12%
Spatio-temporal Scheduling
25%
Surgical Margin
12%
Traffic Flow
18%
Underuse
12%
Ventilation Duct
12%
Work Location
12%
Work Progress
12%
Working Hours
12%
Workspace
25%
Engineering
Accurate Calculation
12%
Adaptability
12%
Augmented Reality
6%
Bar Chart
12%
Bar Code
6%
Building Construction
50%
Building Information Modeling
25%
Collect Data
5%
Collected Data
6%
Constraint Space
12%
Construction Phase
30%
Construction Process
5%
Construction Schedule
12%
Construction Site
100%
Construction Stage
12%
Construction Work
17%
Critical Path
37%
Criticality
8%
Design Science
12%
Duct
8%
Dynamic Model
25%
Effective Space
12%
Lean Manufacturing
12%
Limitations
12%
Material Flow
12%
Model Building
12%
Modeling Concept
12%
Operation Phase
12%
Operation Process
25%
Optical Radar
6%
Photogrammetry
6%
Planning Time
17%
Project Schedule
12%
Proof-of-Concept
12%
Propose Method
8%
Provide Feedback
5%
Real Life
5%
Simplifies
12%
Spatial Information
5%
Stage Operation
12%
Static Model
5%
Subcontractor
12%
Supply Flow
12%