Abstract
This paper considers the problem of production scheduling in a real-life manufacturing plant belonging to the apparel industry. The problem is modeled as a two-stage flexible flow shop, with minimization of both makespan and number of tardy jobs. For this new scheduling problem, we propose a bi-objective evolutionary algorithm. A set of experiments is performed using real data from the company's database. Experimental results show the relevance of the proposed procedure in terms of performance metrics, as opposed to the current manual scheduling procedure as well as against available commercial schedulers. The procedure was actually implemented as the scheduler procedure at the company. Such results also illustrate the improvement in key performance metrics of the production line.
| Translated title of the contribution | Implementing a scheduling procedure based on evolutionary algorithms for the production of hot-stamped labels |
|---|---|
| Original language | Spanish |
| Pages (from-to) | 269-299 |
| Number of pages | 31 |
| Journal | Ingenieria y Universidad |
| Volume | 12 |
| Issue number | 2 |
| Publication status | Published - 2008 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Evolutionary algorithm
- Manufacturing industries-automation
- Production scheduling
ASJC Scopus subject areas
- General Engineering
Fingerprint
Dive into the research topics of 'Implementing a scheduling procedure based on evolutionary algorithms for the production of hot-stamped labels'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver