N2 - This paper presents some of the issues related to the design and construction of curved steel bridges, through the example of a curved steel I-girder bridge at the A-20/A-25/R-132 interchange, in Quebec, whose design was performed by CIMA +. Two aspects are examined in this paper: the first relates to the design, the second to the construction. In the design section, the results of a parametric study, conducted in conjunction with the design, are presented. It was carried out using a 3D model of the bridge structure and the objectives were to investigate: (i) the stress concentrations in the gusset plates; (ii) the influence of the transition radius at the end of the gusset plate on the fatigue performance; (iii) the ideal position of the gusset plates with respect to the main girder flanges. The construction section deals with the installation of the girders and how to integrate the installation step in the design process. The construction approach of installing one girder segment at a time requires the application of large forces in order to install the bracing between the girders. These forces, introduced into the bracing and/or the flanges of the beams, can affect their integrity. A construction approach of installing pairs of girders fully braced on the ground before being installed in their final position was adopted and integrated into the construction staging.
AB - This paper presents some of the issues related to the design and construction of curved steel bridges, through the example of a curved steel I-girder bridge at the A-20/A-25/R-132 interchange, in Quebec, whose design was performed by CIMA +. Two aspects are examined in this paper: the first relates to the design, the second to the construction. In the design section, the results of a parametric study, conducted in conjunction with the design, are presented. It was carried out using a 3D model of the bridge structure and the objectives were to investigate: (i) the stress concentrations in the gusset plates; (ii) the influence of the transition radius at the end of the gusset plate on the fatigue performance; (iii) the ideal position of the gusset plates with respect to the main girder flanges. The construction section deals with the installation of the girders and how to integrate the installation step in the design process. The construction approach of installing one girder segment at a time requires the application of large forces in order to install the bracing between the girders. These forces, introduced into the bracing and/or the flanges of the beams, can affect their integrity. A construction approach of installing pairs of girders fully braced on the ground before being installed in their final position was adopted and integrated into the construction staging.
UR - https://www.scopus.com/pages/publications/84875529233
M3 - Contribution to conference proceedings
AN - SCOPUS:84875529233
SN - 9781622768004
T3 - Proceedings, Annual Conference - Canadian Society for Civil Engineering
SP - 2775
EP - 2784
BT - Annual Conference of the Canadian Society for Civil Engineering 2012
T2 - Annual Conference of the Canadian Society for Civil Engineering 2012: Leadership in Sustainable Infrastructure, CSCE 2012
Y2 - 6 June 2012 through 9 June 2012
ER -