Abstract
The reliability assessment of large rotating structures like hydroelectric Francis runners is often limited by our capacity to define a proper limit state combined with a relevant degradation model. In this paper, we propose that the proper limit state for fatigue reliability of such structures is the onset of high cycle fatigue (HCF). Based on this premise, a prior interval for our limit state based on available literature is presented. The prior assumptions are believed to be the first step toward validation of the applicability and suitability of the proposed model. The paper includes an overview of the theoretical background for reliability assessment of Francis turbine runners, the methodology used, and the results obtained from the information gathered from the available literature.
| Original language | English |
|---|---|
| Pages (from-to) | 565-574 |
| Number of pages | 10 |
| Journal | Procedia Engineering |
| Volume | 66 |
| DOIs | |
| Publication status | Published - 2013 |
| Event | 5th International Conference on Fatigue Design, Fatigue Design 2013 - Senlis, France Duration: 27 Nov 2013 → 28 Nov 2013 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- High Cycle Fatigue (HCF)
- Hydroelectric turbine
- Reliability
ASJC Scopus subject areas
- General Engineering
Fingerprint
Dive into the research topics of 'On the fatigue reliability of hydroelectric Francis runners'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver