Abstract
We consider the control of a stochastic manufacturing system executing capital assets repair and remanufacturing in a closed-loop system. A simple suboptimal control policy in class of multi-hedging point policy is proposed. This policy consists of inventory thresholds related to different predefined repair and replacement modes, depending on the replacement parts availability. This paper focuses on estimating the optimum control policy parameters in terms of total cost by means of simulation tools. A flexible combined discrete event and continuous modelling is introduced and simulation experiments are conducted for a numerical example to achieve a close approximation of the optimal policy.
| Original language | English |
|---|---|
| Pages (from-to) | 205-214 |
| Number of pages | 10 |
| Journal | International Journal of Simulation and Process Modelling |
| Volume | 5 |
| Issue number | 3 |
| DOIs | |
| Publication status | Published - 2009 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- control theory
- hedging point policy
- overhaul
- remanufacturing
- repair
- response surface methodology
- simulation
- unreliable supply
ASJC Scopus subject areas
- Modeling and Simulation
- Computer Science Applications
- Applied Mathematics
Fingerprint
Dive into the research topics of 'Optimisation of the control policy for a stochastic remanufacturing system with an unreliable replacement parts supply'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver