Abstract
The feasibility of Plus Energy Building for a sample relevant case is investigated. After a literature review aimed to identify key aspects of this type of buildings, a preliminary evaluation of the thermal performance of a building constructed using conventional material is presented together with a parametric analysis of the impact of typical influential parameters. Solar domestic hot water (SDHW) and photovoltaic systems (PV) are considered in the study. Numerical simulations indicate that for the examined sample case (Beirut in Lebanon) the total annual energy need of conventional building is 87.1 kWh/y.m2. About 49% of energy savings can be achieved by improving the building envelope and installing energy efficient technologies. Moreover, about 90% of energy savings in domestic hot water production can be achieved by installing a SDHW system composed of two solar collectors connected in series. Finally, the addition of a grid connected PV array system can significantly mitigate the energy needs of the building leading to an annual excess of energy.
| Original language | English |
|---|---|
| Pages (from-to) | 117-134 |
| Number of pages | 18 |
| Journal | Fluid Dynamics and Materials Processing |
| Volume | 19 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 2022 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
!!!Keywords
- Plus energy building
- building performance simulation
- energy-efficient design
- parametric analysis
- solar energy
Fingerprint
Dive into the research topics of 'Plus Energy Buildings: A Numerical Case Study'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver