Abstract
This paper presents the development of a model, using TRNSYS, of a large central cooling and heating plant. The model includes the chillers, cooling towers and pumps of the chilled water loop, and the heat recovery system from the chillers. The model is calibrated with monitored data of June 23rd to June 29th, 2008, and then tested with data over the summer season, from June 23 to September 21, 2008. The simulated water temperature at several key locations in the system and the electric input to the equipment such as chillers, cooling towers and circulating pumps are compared with the measured values. The simulated Coefficient of Performance (COP) of the chillers and the overall central cooling plant are compared with the measured values.
| Original language | English |
|---|---|
| Pages | 1899-1906 |
| Number of pages | 8 |
| Publication status | Published - 2009 |
| Externally published | Yes |
| Event | 11th International IBPSA Conference - Building Simulation 2009, BS 2009 - Glasgow, United Kingdom Duration: 27 Jul 2007 → 30 Jul 2007 |
Conference
| Conference | 11th International IBPSA Conference - Building Simulation 2009, BS 2009 |
|---|---|
| Country/Territory | United Kingdom |
| City | Glasgow |
| Period | 27/07/07 → 30/07/07 |
Fingerprint
Dive into the research topics of 'Simulation of a large central cooling and heating plant using TRNSYS and calibration with monitored data'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver