Abstract
Canada has been experimenting with wind-diesel hybrid systems for its remote communities for over 25 years with limited success. This paper discusses the results of a year-long survey that was distributed to stakeholders in wind-diesel systems in remote Canadian communities. These stakeholders include utilities, wind energy technology manufacturers, project developers, researchers, and governments. The analysis shows that there is a strong agreement that capital and operating costs are the most significant barriers to the implementation of wind-diesel systems and that direct project financial incentives, notably production and capital cost incentives designed to reduce these costs are perceived as the most effective way to encourage development. There is a notable disagreement between utilities and governments on one hand, who are split as to the current technical viability of wind-diesel systems, and manufacturers, developers, and researchers on the other, who overwhelmingly believe that wind-diesel systems are mature enough for remote applications.
| Original language | English |
|---|---|
| Pages (from-to) | 1611-1621 |
| Number of pages | 11 |
| Journal | Energy Policy |
| Volume | 36 |
| Issue number | 5 |
| DOIs | |
| Publication status | Published - May 2008 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Incentives
- Policy barriers
- Wind-diesel
ASJC Scopus subject areas
- General Energy
- Management, Monitoring, Policy and Law
Fingerprint
Dive into the research topics of 'Stakeholders' perspectives on barriers to remote wind-diesel power plants in Canada'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver