Passer à la navigation principale
Passer à la recherche
Passer au contenu principal
Trier par
Keyphrases
Backlog
36%
Control Policy
100%
Control Problem
26%
Demand Rate
14%
Deteriorating System
30%
Failure Rate
13%
Failure-prone
34%
Failure-prone Manufacturing System
22%
Hamilton-Jacobi-Bellman Equation
13%
Hedging Point Policy
31%
Hybrid Manufacturing/remanufacturing System
21%
Integrated Production
18%
Inventory Cost
13%
Joint Production
42%
Machine Failure
12%
Maintenance Control
22%
Maintenance Strategy
14%
Manufacturing Systems
79%
Numerical Examples
32%
Optimal Control Strategy
23%
Optimal Policy
15%
Optimal Production
16%
Optimal Production Control
13%
Optimality Conditions
24%
Preventive Maintenance
59%
Product Manufacturing
18%
Product Returns
16%
Product Type
15%
Production Control
68%
Production Maintenance
47%
Production Planning
32%
Production Policy
35%
Production Process
13%
Production Rate
42%
Production Strategy
13%
Production System
17%
Quality Control
19%
Random Demand
13%
Random Failure
14%
Remanufacturing
26%
Remanufacturing System
15%
Repair Time
13%
Replacement Policy
13%
Replenishment
13%
Response Surface Methodology
18%
Sensitivity Analysis
43%
Simulation Model
12%
Simulation Optimization
13%
Single Product
16%
Unreliable Manufacturing System
50%
Engineering
Analytical Model
6%
Cellular Manufacturing
7%
Control Parameter
5%
Corrective Maintenance
7%
Decision Variable
7%
Design of Experiments
10%
Experimental Design
5%
Failure Rate
7%
Flexible Manufacturing System
5%
Gas Fuel Manufacture
87%
Joints (Structural Components)
49%
Maintenance Planning
6%
Maintenance Strategy
17%
Mathematical Model
6%
Mathematical Modeling
6%
Numerical Example
23%
Numerical Method
5%
Optimal Control
17%
Optimal Policy
8%
Optimality
11%
Optimisation Problem
8%
Optimization Approach
5%
Planning Horizon
8%
Policy Control
51%
Preventive Maintenance
43%
Product Manufacturing
7%
Product Quality
7%
Product Type
6%
Production Planning
16%
Production Strategy
6%
Production System
26%
Quality Control
22%
Random Demand
7%
Random Failure
12%
Rate Control
6%
Remanufacturing
39%
Response Surface Methodology
9%
Returned Product
11%
Safety Stock
6%
Sampling Plan
8%
Service Level
7%
Simulation Model
8%
Simulation Result
5%
Subcontractor
8%
System Parameter
7%
Systems Performance
5%