An Integrated Decision Support Model for Early Planning in Off-Site Construction Projects

  • École de technologie supérieure
  • University of Regina

Résultats de recherche: Contribution à un journalArticle publié dans une revue, révisé par les pairsRevue par des pairs

Résumé

The construction industry is evolving toward more standardized, supply chain-oriented, modular, and integrated practices. This research introduces a novel transition matrix-based mixed-integer linear programming (MILP) model that optimizes modular construction (MC) design alongside supply chain decisions. The model incorporates real-world factors, such as modular element selection, supplier identification, and process sequencing and timing. Its unique contribution lies in the simultaneous optimization of both design and supply chain decisions within a unified framework. The model also enables sensitivity analysis on design choices, supplier alternatives, and productivity, supporting robust scenario planning and risk mitigation. Applied to both small and large-scale instances, the model proves computationally efficient and practical for real-world use. Results show that higher upfront investments in MC lead to improved inventory control, lower onsite costs, significantly shorter project durations, up to 44% faster completion, and 86% reduction in onsite work. The model fills existing research gaps by integrating decisions of MC, supply chain, and project management, offering a valuable project planning tool for general contractors. The model enhances early-phase decision making, collaboration, and cost-effectiveness while providing detailed insights into supplier management and the performance impact of modularity.

langue originaleAnglais
Numéro d'article04026142
journalJournal of Construction Engineering and Management
Volume152
Numéro de publication9
Les DOIs
étatPublié - 1 sept. 2026

Empreinte digitale

Voici les principaux termes ou expressions associés à « An Integrated Decision Support Model for Early Planning in Off-Site Construction Projects ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.

Citer cette ressorce