TY - GEN
T1 - Combining LR and 2-opt for scheduling a single machine subject to job ready times and sequence dependent setup times
AU - Rojas-Santiago, Miguel
AU - Muthuswamy, Shanthi
AU - Vélez-Gallego, Mario C.
AU - Montoya-Torres, Jairo R.
PY - 2014
Y1 - 2014
N2 - In this research, the job ready times and sequence-dependent setup times of a single machine scheduling problem are considered with the objective of makespan minimization. As the problem is NP-hard, a Lagrangean Relaxation (LR) approach is proposed to find an initial solution and a heuristic based on 2-opt was implemented to improve it. Extensive computational experiments showed that the proposed combination of LR and 2-opt is effective. Wide range of test problems from 25 to 75 jobs was studied. The performance of the proposed approach was compared with the results from a commercial solver.
AB - In this research, the job ready times and sequence-dependent setup times of a single machine scheduling problem are considered with the objective of makespan minimization. As the problem is NP-hard, a Lagrangean Relaxation (LR) approach is proposed to find an initial solution and a heuristic based on 2-opt was implemented to improve it. Extensive computational experiments showed that the proposed combination of LR and 2-opt is effective. Wide range of test problems from 25 to 75 jobs was studied. The performance of the proposed approach was compared with the results from a commercial solver.
KW - 2-opt
KW - Lagrange relaxation
KW - Makespan
KW - Sequence-dependent set up times
KW - Single machine scheduling
UR - https://www.scopus.com/pages/publications/84910092481
M3 - Contribution to conference proceedings
AN - SCOPUS:84910092481
T3 - IIE Annual Conference and Expo 2014
SP - 92
EP - 100
BT - IIE Annual Conference and Expo 2014
PB - Institute of Industrial Engineers
T2 - IIE Annual Conference and Expo 2014
Y2 - 31 May 2014 through 3 June 2014
ER -