Résumé
Studies have confirmed the benefits of using Third-party logistics (TPL) for efficient construction management, especially in large projects. Nevertheless, there is a dearth of decision-making models evaluating the exact role of TPL providers as drivers for supply chain (SC) integration and optimisation. This study aims to develop a decision-making model for construction supply chain (CSC) optimisation, with possible TPL integration. The proposed model considers two types of purchased materials (type-1 and type-2) and assists the main contractor in determining construction supply chain management (CSCM) strategies, including supplier selection, order quantity determination, and TPL use evaluation. Using the model, the main contractor can take advantage of the TPL provider’s warehouse and order larger quantities, if necessary, to obtain lower prices offered by suppliers. Through case examples in Canada, we find that the proposed model performs better in optimising total SC cost, as compared to the model without TPL. Model validations also show that TPL can be conditionally used to improve construction logistics performance and to meet practical requirements targeting issues in the construction industry.
| langue originale | Anglais |
|---|---|
| Pages (de - à) | 133-155 |
| Nombre de pages | 23 |
| journal | Construction Management and Economics |
| Volume | 39 |
| Numéro de publication | 2 |
| Les DOIs | |
| état | Publié - 2021 |
Classification disciplinaire ASJC Scopus
- Systèmes d'information de gestion
- Bâtiment et construction
- Ingénierie industrielle et de fabrication
Empreinte digitale
Voici les principaux termes ou expressions associés à « Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver