Recently, new methods and technologies, including building information modeling (BIM) and lean management, have been introduced to the construction industry. Their objectives are to increase collaboration, ensure smooth flows of information, improve productivity, reduce different types of waste, and stabilize production. These constraints have forced the industry to gradually change by applying more adapted operational processes and contractual models that focus on value and by integrating the design, construction, and operation phases. Traditional scheduling methods based on activities modeling have become less adapted to this new reality. As a result, complementary concepts have emerged, particularly the Last Planner system, takt time, space planning, and spatiotemporal scheduling. This paper presents an extensive review and an assessment of the state of the art of the spatiotemporal planning of construction projects. The paper categorizes the research efforts, presents a timeline of the most significant scientific developments in this domain, and addresses their possible impacts on the construction industry.
| Langue originale | Anglais |
|---|---|
| Numéro d'article | 128 |
| Revue | Frontiers in Built Environment |
| Volume | 6 |
| Les DOIs | |
| État | Publié - 5 août 2020 |
SDG des Nations Unies
Ce résultat contribue à ou aux Objectifs de développement durable suivants
-
SDG 9 – Industrie, innovation et infrastructure
Classification disciplinaire ASJC Scopus
- Géographie, planification et développement
- Bâtiment et construction
- Etudes urbaines
Empreinte digitale
Voici les principaux termes ou expressions associés à « Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver