T1 - The chronographical modeling for construction project planning
AU - Francis, Adel
PY - 2016
Y1 - 2016
N2 - Graphical modelling is considered a suitable approach for displaying project data because of its ability to effectively communicate information. The current scheduling methods seem to be unable, individually, to meet all of the planner's needs, to be understood visually, and to be efficient in terms of displaying as much information as possible. The main is to present the Chronographical Modelling for planning and monitoring construction projects. The Chronographical Conceptual Framework describes all the elements required to perform construction operations, their processes, their logical constraints and their association and organisational models and studies the suitable visual parameters and their associated values in order to define a standard graphical. In this way, graphic representation becomes a living, transformable image. The graphical modelling is classified into seven (7) categories: Table Series, Cross-tabulation Series, Pure Logic Series, Time-Scaled Series, Chrono Series, CAD Series, and Chart Series. This classification illustrates how the information can be presented using different strategies resulting in the presentation of the same project schedule through different compatible approaches. The organisational approach permits to alternate from one visual approach to another by manipulation of graphics via a set of defined graphical parameters. Each individual approach can help to schedule a certain project type or speciality, show valuable information in a clear and comprehensible manner, and facilitate the management of construction site problems visually. Visual communication can also be improved through layering, sheeting, juxtaposition, alterations and permutations, allowing for groupings, hierarchies and classification of project information. The validation process was performed using case studies that evaluated visual data and assessed the necessary mental effort required to find information on the schedule. The results have clearly demonstrated that this convention helps to simplify the process of searching for information on the schedule.
AB - Graphical modelling is considered a suitable approach for displaying project data because of its ability to effectively communicate information. The current scheduling methods seem to be unable, individually, to meet all of the planner's needs, to be understood visually, and to be efficient in terms of displaying as much information as possible. The main is to present the Chronographical Modelling for planning and monitoring construction projects. The Chronographical Conceptual Framework describes all the elements required to perform construction operations, their processes, their logical constraints and their association and organisational models and studies the suitable visual parameters and their associated values in order to define a standard graphical. In this way, graphic representation becomes a living, transformable image. The graphical modelling is classified into seven (7) categories: Table Series, Cross-tabulation Series, Pure Logic Series, Time-Scaled Series, Chrono Series, CAD Series, and Chart Series. This classification illustrates how the information can be presented using different strategies resulting in the presentation of the same project schedule through different compatible approaches. The organisational approach permits to alternate from one visual approach to another by manipulation of graphics via a set of defined graphical parameters. Each individual approach can help to schedule a certain project type or speciality, show valuable information in a clear and comprehensible manner, and facilitate the management of construction site problems visually. Visual communication can also be improved through layering, sheeting, juxtaposition, alterations and permutations, allowing for groupings, hierarchies and classification of project information. The validation process was performed using case studies that evaluated visual data and assessed the necessary mental effort required to find information on the schedule. The results have clearly demonstrated that this convention helps to simplify the process of searching for information on the schedule.
KW - Chronographic
KW - Modeling
KW - Precedence. Construction
KW - Project
KW - Scheduling
UR - https://www.scopus.com/pages/publications/85030690021
M3 - Contribution to conference proceedings
AN - SCOPUS:85030690021
T3 - Proceedings, Annual Conference - Canadian Society for Civil Engineering
SP - 231
EP - 232
BT - Canadian Society for Civil Engineering Annual Conference 2016
PB - Canadian Society for Civil Engineering
T2 - Canadian Society for Civil Engineering Annual Conference 2016: Resilient Infrastructure
Y2 - 1 June 2016 through 4 June 2016
ER -