Passer à la navigation principale Passer à la recherche Passer au contenu principal

The Economic Paradox of Design and the integration of Artificial Intelligence (AI) within Building Information Modelling (BIM)

  • École de technologie supérieure

Résultats de recherche: Chapitre dans un livre, rapport, actes de conférenceParticipation à un ouvrage collectif lié à un colloque ou une conférenceRevue par des pairs

Résumé

The management of data in complex construction projects represents a significant challenge in the design and realization of infrastructure. This paper examines the implementation of an integrated Common Data Environment (CDE) to centralize graphical and non-graphical information, aiming to optimize coordination, improve quality, and increase productivity throughout the project lifecycle. The study advocates for shifting effort to the initial design phases where decisions have the maximum impact on performance and cost. It further explores the integration of Artificial Intelligence (AI) within Building Information Modelling (BIM) workflows, emphasizing that structured data collection is a prerequisite for advanced automation. The methodology aligns with Integrated Project Delivery (IPD) models and Concurrent Design principles to foster stakeholder collaboration. Results indicate that establishing a centralized data repository allows for the effective deployment of predictive AI models. The article concludes that the successful digital transformation of the construction sector requires a collective commitment to collaborative cultures and rigorous data centralization from the onset of conception.

langue originaleAnglais
titreProceedings of the 43rd International Symposium on Automation and Robotics in Construction, ISARC 2026
rédacteurs en chefQian Chen, Gaang Lee, Ci-Jyun Liang, Jiansong Zhang, Vineet R. Kamat
EditeurInternational Association for Automation and Robotics in Construction (IAARC)
Pages802-809
Nombre de pages8
ISBN (Electronique)9780645832235
Les DOIs
étatPublié - 2026
Evénement43rd International Symposium on Automation and Robotics in Construction, ISARC 2026 - Singapore, Singapour
Durée: 22 juin 202626 juin 2026

Série de publications

NomProceedings of the International Symposium on Automation and Robotics in Construction
ISSN (Electronique)2413-5844

Conférence

Conférence43rd International Symposium on Automation and Robotics in Construction, ISARC 2026
Pays/TerritoireSingapour
La villeSingapore
période22/06/2626/06/26

Empreinte digitale

Voici les principaux termes ou expressions associés à « The Economic Paradox of Design and the integration of Artificial Intelligence (AI) within Building Information Modelling (BIM) ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.

Citer cette ressource