Using Change Orders to Measure the Impact of Building Information Modeling: A Case Study

  • City of Montreal

Résultats de recherche: Chapitre dans un livre, rapport, actes de conférence › Participation à un ouvrage collectif lié à un colloque ou une conférence › Revue par des pairs

2 Citations (Scopus)

Résumé

While the added value of Building Information Modeling (BIM) has been demonstrated by several studies, measuring the added value of using BIM on a specific project is a challenging task. The use of key performance indicators (KPIs) is necessary for what is important to choose as the best indicators to achieve reliable results: change orders are one of these indicators. Change orders are defined as events resulting in a modification of the original scope, execution time or cost of construction work. Due to the importance of their impact on project performance, change orders are known as one of the most used performance indicators in the construction industry. The research work reported in this paper aims at proposing an innovative evaluation approach, based on metrics from a single BIM project and the feedback from the client. The results suggest that for the construction management method to be effective, it is important to clearly identify the BIM requirements at the very start of the project and but above all, to integrate them into contracts with the various stakeholders to create a solid foundation.

langue originaleAnglais
titreAdvances in Information Technology in Civil and Building Engineering - Proceedings of ICCCBE 2024 - Volume 1
Sous-titreModeling and Scheduling
rédacteurs en chefAdel Francis, Edmond Miresco, Silvio Melhado
EditeurSpringer Science and Business Media Deutschland GmbH
Pages445-458
Nombre de pages14
ISBN (imprimé)9783031842078
Les DOIs
étatPublié - 2025
Evénement20th International Conference on Computing in Civil and Building Engineering, ICCCBE 2024 - Montreal, Canada
Durée: 25 août 2024 → 28 août 2024

Série de publications

NomLecture Notes in Civil Engineering
Volume628 LNCE
ISSN (imprimé)2366-2557
ISSN (Electronique)2366-2565

Conférence

Conférence20th International Conference on Computing in Civil and Building Engineering, ICCCBE 2024
Pays/TerritoireCanada
La villeMontreal
Période25/08/24 → 28/08/24

SDG des Nations Unies

Ce résultat contribue à ou aux Objectifs de développement durable suivants

  1. SDG 9 – Industrie, innovation et infrastructure
    SDG 9 – Industrie, innovation et infrastructure

Empreinte digitale

Voici les principaux termes ou expressions associés à « Using Change Orders to Measure the Impact of Building Information Modeling: A Case Study ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.

Citer cette ressource