Abstract
We consider the problem of scheduling jobs in a hybrid flowshop with two stages. Our objective is to minimize both the makespan and the total completion time of jobs. This problem has been little studied in the literature. To solve the problem, we propose an ant colony optimization procedure. Computational experiments are conducted using random-generated instances from the literature. In comparison against other well-known heuristics from the literature, experimental results show that our algorithm outperforms such heuristics.
| Original language | English |
|---|---|
| Pages (from-to) | 815-822 |
| Number of pages | 8 |
| Journal | Journal of Intelligent Manufacturing |
| Volume | 22 |
| Issue number | 5 |
| DOIs | |
| Publication status | Published - Oct 2011 |
| Externally published | Yes |
Keywords
- Ant colony optimization
- Hybrid flowshop
- Multi-criteria
- Scheduling
ASJC Scopus subject areas
- Software
- Industrial and Manufacturing Engineering
- Artificial Intelligence
Fingerprint
Dive into the research topics of 'Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver