Résumé
We consider the problem of scheduling jobs in a hybrid flowshop with two stages. Our objective is to minimize both the makespan and the total completion time of jobs. This problem has been little studied in the literature. To solve the problem, we propose an ant colony optimization procedure. Computational experiments are conducted using random-generated instances from the literature. In comparison against other well-known heuristics from the literature, experimental results show that our algorithm outperforms such heuristics.
| langue originale | Anglais |
|---|---|
| Pages (de - à) | 815-822 |
| Nombre de pages | 8 |
| journal | Journal of Intelligent Manufacturing |
| Volume | 22 |
| Numéro de publication | 5 |
| Les DOIs | |
| état | Publié - oct. 2011 |
| Modification externe | Oui |
Classification disciplinaire ASJC Scopus
- Logiciel
- Ingénierie industrielle et de fabrication
- Intelligence artificielle
Empreinte digitale
Voici les principaux termes ou expressions associés à « Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver