Abstract
This paper considers our work in progress on the problem of scheduling production activities in a real-life manufacturing plant. The problem is modelled as a two-stage flexible flow shop problem with minimization of both the makespan and the number of tardy jobs. We described the design approach of an evolutionary algorithm. Preliminary experiments are performed and results obtained motivate us to actually implement the proposed procedure.
| Original language | English |
|---|---|
| Pages | 219-222 |
| Number of pages | 4 |
| Publication status | Published - 2007 |
| Externally published | Yes |
| Event | 2007 5th International Industrial Simulation Conference, ISC 2007 - Delft, Netherlands Duration: 11 Jun 2007 → 13 Jun 2007 |
Conference
| Conference | 2007 5th International Industrial Simulation Conference, ISC 2007 |
|---|---|
| Country/Territory | Netherlands |
| City | Delft |
| Period | 11/06/07 → 13/06/07 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Evolutionary algorithm
- Makespan
- Printed labels manufacturing
- Scheduling
- Tardy jobs
- Thermal transfer
ASJC Scopus subject areas
- Modeling and Simulation
Fingerprint
Dive into the research topics of 'Design and implementation of a bi-objective ea-based scheduling strategy: Case study in thermal-printed label manufacturing'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver