Résumé
This paper considers our work in progress on the problem of scheduling production activities in a real-life manufacturing plant. The problem is modelled as a two-stage flexible flow shop problem with minimization of both the makespan and the number of tardy jobs. We described the design approach of an evolutionary algorithm. Preliminary experiments are performed and results obtained motivate us to actually implement the proposed procedure.
| langue originale | Anglais |
|---|---|
| Pages | 219-222 |
| Nombre de pages | 4 |
| état | Publié - 2007 |
| Modification externe | Oui |
| Evénement | 2007 5th International Industrial Simulation Conference, ISC 2007 - Delft, Pays-Bas Durée: 11 juin 2007 → 13 juin 2007 |
Conférence
| Conférence | 2007 5th International Industrial Simulation Conference, ISC 2007 |
|---|---|
| Pays/Territoire | Pays-Bas |
| La ville | Delft |
| Période | 11/06/07 → 13/06/07 |
SDG des Nations Unies
Ce résultat contribue à ou aux Objectifs de développement durable suivants
-
SDG 9 – Industrie, innovation et infrastructure
Empreinte digitale
Voici les principaux termes ou expressions associés à « Design and implementation of a bi-objective ea-based scheduling strategy: Case study in thermal-printed label manufacturing ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver