Abstract
This paper considers a production scheduling problem in a cardboard corrugator manufacturing plant. In the literature, this problem is known as the two-dimensional cutting-stock problem, and most of the optimisation techniques only focus on minimising either trim waste or pattern changes. This paper proposes an evolutionary algorithm to optimise the service level constrained to some preferences of production planning. Conducted experiments using real data are compared with the current scheduling method used in the plant.
| Original language | English |
|---|---|
| Pages | 215-218 |
| Number of pages | 4 |
| Publication status | Published - 2007 |
| Externally published | Yes |
| Event | 2007 5th International Industrial Simulation Conference, ISC 2007 - Delft, Netherlands Duration: 11 Jun 2007 → 13 Jun 2007 |
Conference
| Conference | 2007 5th International Industrial Simulation Conference, ISC 2007 |
|---|---|
| Country/Territory | Netherlands |
| City | Delft |
| Period | 11/06/07 → 13/06/07 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- AI-based optimization
- Evolutionary algorithm
- Manufacturing
- Scheduling
ASJC Scopus subject areas
- Modeling and Simulation
Fingerprint
Dive into the research topics of 'Implementing an evolutionary algorithm for production scheduling in a cardboard corrugated fabrication plant'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver