Résumé
This paper considers a production scheduling problem in a cardboard corrugator manufacturing plant. In the literature, this problem is known as the two-dimensional cutting-stock problem, and most of the optimisation techniques only focus on minimising either trim waste or pattern changes. This paper proposes an evolutionary algorithm to optimise the service level constrained to some preferences of production planning. Conducted experiments using real data are compared with the current scheduling method used in the plant.
| Langue originale | Anglais |
|---|---|
| Pages | 215-218 |
| Nombre de pages | 4 |
| État | Publié - 2007 |
| Modification externe | Oui |
| Evénement | 2007 5th International Industrial Simulation Conference, ISC 2007 - Delft, Pays-Bas Durée: 11 juin 2007 → 13 juin 2007 |
Conférence
| Conférence | 2007 5th International Industrial Simulation Conference, ISC 2007 |
|---|---|
| Pays/Territoire | Pays-Bas |
| La ville | Delft |
| Période | 11/06/07 → 13/06/07 |
SDG des Nations Unies
Ce résultat contribue à ou aux Objectifs de développement durable suivants
-
SDG 9 – Industrie, innovation et infrastructure
Classification disciplinaire ASJC Scopus
- Modélisation et simulation
Empreinte digitale
Voici les principaux termes ou expressions associés à « Implementing an evolutionary algorithm for production scheduling in a cardboard corrugated fabrication plant ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver