Abstract
Several manufacturing processes such as painting and metalworking consider machine setup times between jobs as a substantial component of its total production cost. In this paper we consider the single machine scheduling problem under job release dates and sequence-dependent setup times with the objective of minimizing the makespan. A mixed integer linear program (MILP) is presented to solve the problem. Also, as the problem is known to be NP-hard, two heuristic approaches are proposed for solving those instances for which a commercial solver takes a prohibitive amount of time to terminate: Variable Neighborhood Search (VNS) and Ant Colony Optimization (ACO). Computational experiments were carried out using a well-known set of instances from the literature. Our results show that the proposed heuristics are effective in solving the problem at a reasonable computational cost.
| Original language | English |
|---|---|
| Pages | 1217-1226 |
| Number of pages | 10 |
| Publication status | Published - 2012 |
| Externally published | Yes |
| Event | 62nd IIE Annual Conference and Expo 2012 - Orlando, FL, United States Duration: 19 May 2012 → 23 May 2012 |
Conference
| Conference | 62nd IIE Annual Conference and Expo 2012 |
|---|---|
| Country/Territory | United States |
| City | Orlando, FL |
| Period | 19/05/12 → 23/05/12 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Ant colony optimization
- Sequence-dependent setup times
- Single machine scheduling
- Variable neighborhood search
ASJC Scopus subject areas
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Makespan minimization on a single machine subject to job release dates and sequence dependent setup times'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver