Résumé
Several manufacturing processes such as painting and metalworking consider machine setup times between jobs as a substantial component of its total production cost. In this paper we consider the single machine scheduling problem under job release dates and sequence-dependent setup times with the objective of minimizing the makespan. A mixed integer linear program (MILP) is presented to solve the problem. Also, as the problem is known to be NP-hard, two heuristic approaches are proposed for solving those instances for which a commercial solver takes a prohibitive amount of time to terminate: Variable Neighborhood Search (VNS) and Ant Colony Optimization (ACO). Computational experiments were carried out using a well-known set of instances from the literature. Our results show that the proposed heuristics are effective in solving the problem at a reasonable computational cost.
| langue originale | Anglais |
|---|---|
| Pages | 1217-1226 |
| Nombre de pages | 10 |
| état | Publié - 2012 |
| Modification externe | Oui |
| Evénement | 62nd IIE Annual Conference and Expo 2012 - Orlando, FL, Etats-Unis Durée: 19 mai 2012 → 23 mai 2012 |
Conférence
| Conférence | 62nd IIE Annual Conference and Expo 2012 |
|---|---|
| Pays/Territoire | Etats-Unis |
| La ville | Orlando, FL |
| Période | 19/05/12 → 23/05/12 |
SDG des Nations Unies
Ce résultat contribue à ou aux Objectifs de développement durable suivants
-
SDG 9 – Industrie, innovation et infrastructure
Empreinte digitale
Voici les principaux termes ou expressions associés à « Makespan minimization on a single machine subject to job release dates and sequence dependent setup times ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver