Skip to main navigation Skip to search Skip to main content

Optimum task size, multitasking and utilization levels for lean product development

  • Concordia University
  • McGill University

Research output: Contribution to conference types › Conference Paper › peer-review

1 Citation (Scopus)

Abstract

Flow of information is of utmost importance in product development (PD) endeavors, with timely feedback supporting resolution of project higher risk elements. PD task size, multitasking and utilization levels of the PD system influences information flow, and the value ultimately realized from the investment in PD. In this paper, a model incorporating Jackson network measurements is extended helping engineering management to improve PD task flow. Factors considered include optimal PD task size, multitasking (focus) level, as well as the utilization level of resources involved in PD. Empirical data is collected from a case study, and compared to optimal values, and the benefits of the model and approaches are discussed.

Original languageEnglish
Publication statusPublished - 2011
Externally publishedYes
Event61st Annual Conference and Expo of the Institute of Industrial Engineers - Reno, NV, United States
Duration: 21 May 2011 → 25 May 2011

Conference

Conference61st Annual Conference and Expo of the Institute of Industrial Engineers
Country/TerritoryUnited States
CityReno, NV
Period21/05/11 → 25/05/11

Keywords

  • Lean product development
  • Multitasking
  • Task size
  • Utilization

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'Optimum task size, multitasking and utilization levels for lean product development'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.

Cite this