Abstract
Flow of information is of utmost importance in product development (PD) endeavors, with timely feedback supporting resolution of project higher risk elements. PD task size, multitasking and utilization levels of the PD system influences information flow, and the value ultimately realized from the investment in PD. In this paper, a model incorporating Jackson network measurements is extended helping engineering management to improve PD task flow. Factors considered include optimal PD task size, multitasking (focus) level, as well as the utilization level of resources involved in PD. Empirical data is collected from a case study, and compared to optimal values, and the benefits of the model and approaches are discussed.
| Original language | English |
|---|---|
| Publication status | Published - 2011 |
| Externally published | Yes |
| Event | 61st Annual Conference and Expo of the Institute of Industrial Engineers - Reno, NV, United States Duration: 21 May 2011 → 25 May 2011 |
Conference
| Conference | 61st Annual Conference and Expo of the Institute of Industrial Engineers |
|---|---|
| Country/Territory | United States |
| City | Reno, NV |
| Period | 21/05/11 → 25/05/11 |
Keywords
- Lean product development
- Multitasking
- Task size
- Utilization
ASJC Scopus subject areas
- Industrial and Manufacturing Engineering
Fingerprint
Dive into the research topics of 'Optimum task size, multitasking and utilization levels for lean product development'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver