Résumé
Flow of information is of utmost importance in product development (PD) endeavors, with timely feedback supporting resolution of project higher risk elements. PD task size, multitasking and utilization levels of the PD system influences information flow, and the value ultimately realized from the investment in PD. In this paper, a model incorporating Jackson network measurements is extended helping engineering management to improve PD task flow. Factors considered include optimal PD task size, multitasking (focus) level, as well as the utilization level of resources involved in PD. Empirical data is collected from a case study, and compared to optimal values, and the benefits of the model and approaches are discussed.
| Langue originale | Anglais |
|---|---|
| État | Publié - 2011 |
| Modification externe | Oui |
| Evénement | 61st Annual Conference and Expo of the Institute of Industrial Engineers - Reno, NV, Etats-Unis Durée: 21 mai 2011 → 25 mai 2011 |
Conférence
| Conférence | 61st Annual Conference and Expo of the Institute of Industrial Engineers |
|---|---|
| Pays/Territoire | Etats-Unis |
| La ville | Reno, NV |
| Période | 21/05/11 → 25/05/11 |
Classification disciplinaire ASJC Scopus
- Ingénierie industrielle et de fabrication
Empreinte digitale
Voici les principaux termes ou expressions associés à « Optimum task size, multitasking and utilization levels for lean product development ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver