Production scheduling with sequencedependent setups and job release times

  • Universidad de la Sabana
  • Universidad del Norte

Research output: Contribution to journal › Journal Article › peer-review

17 Citations (Scopus)

Abstract

This paper studies a shortterm production scheduling problem inspired from reallife manufacturing systems consisting on the scheduling a set of jobs (production orders) on both a single machine and identical parallel machines with the objective of minimizing the makespan or maximum completion time of all jobs. Jobs are subject to release dates and there are sequencedependent machine setup times. Since this problem is known to be strongly NP-hard even for the single machine case, this paper proposes a heuristic algorithm to solve it. The algorithm uses a strategy of random generation of various execution sequences, and then selects the best of such schedules. Experiments are performed using randomgenerated data and show that the heuristic performs very well compared against the optimal solution and lower bounds, and requiring short computational time.

Original languageEnglish
Pages (from-to)260-269
Number of pages10
JournalDYNA (Colombia)
Volume77
Issue number163
Publication statusPublished - 2010
Externally publishedYes

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Keywords

  • Heuristic
  • Randomness
  • Release dates
  • Scheduling
  • Sequencedependent setup times

ASJC Scopus subject areas

  • General Engineering

Fingerprint

Dive into the research topics of 'Production scheduling with sequencedependent setups and job release times'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.

Cite this