Résumé
This paper studies a shortterm production scheduling problem inspired from reallife manufacturing systems consisting on the scheduling a set of jobs (production orders) on both a single machine and identical parallel machines with the objective of minimizing the makespan or maximum completion time of all jobs. Jobs are subject to release dates and there are sequencedependent machine setup times. Since this problem is known to be strongly NP-hard even for the single machine case, this paper proposes a heuristic algorithm to solve it. The algorithm uses a strategy of random generation of various execution sequences, and then selects the best of such schedules. Experiments are performed using randomgenerated data and show that the heuristic performs very well compared against the optimal solution and lower bounds, and requiring short computational time.
| Langue originale | Anglais |
|---|---|
| Pages (de - à) | 260-269 |
| Nombre de pages | 10 |
| Revue | DYNA (Colombia) |
| Volume | 77 |
| Numéro de publication | 163 |
| État | Publié - 2010 |
| Modification externe | Oui |
SDG des Nations Unies
Ce résultat contribue à ou aux Objectifs de développement durable suivants
-
SDG 9 – Industrie, innovation et infrastructure
Classification disciplinaire ASJC Scopus
- Ingénierie générale
Empreinte digitale
Voici les principaux termes ou expressions associés à « Production scheduling with sequencedependent setups and job release times ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver