Skip to main navigation Skip to search Skip to main content

Scheduling of multiple projects with constrained resources and preemption

  • Universidad de la Sabana

Research output: Contribution to journal › Journal Article › peer-review

Abstract

The resource-constrained (single) project scheduling problem has been widely studied in literature. A common assumption in its basic version is that the execution of activities cannot be interrupted, that is activities are non-preemptable. Very little effort has been made to analyse the impact of activity preemption. In addition, classical project scheduling models only consider the case of a single project. This paper considers the problem of scheduling multiple projects under the assumption of activities preemption. A heuristic algorithm is proposed and its performance is analysed using several well-known priority rules. Computational experiments are carried out using the well-known datasets from the PSP Library. Results show the advantages of incorporating activity preemption when scheduling multiple projects.

Original languageEnglish
Pages (from-to)127-148
Number of pages22
JournalInternational Journal of Operational Research
Volume27
Issue number1-2
DOIs
Publication statusPublished - 2016
Externally publishedYes

!!!Keywords

  • Heuristic
  • Multiple projects
  • Preemption
  • Priority rules
  • Project scheduling
  • Resource constrained

Fingerprint

Dive into the research topics of 'Scheduling of multiple projects with constrained resources and preemption'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.

Cite this