Résumé
The resource-constrained (single) project scheduling problem has been widely studied in literature. A common assumption in its basic version is that the execution of activities cannot be interrupted, that is activities are non-preemptable. Very little effort has been made to analyse the impact of activity preemption. In addition, classical project scheduling models only consider the case of a single project. This paper considers the problem of scheduling multiple projects under the assumption of activities preemption. A heuristic algorithm is proposed and its performance is analysed using several well-known priority rules. Computational experiments are carried out using the well-known datasets from the PSP Library. Results show the advantages of incorporating activity preemption when scheduling multiple projects.
| Langue originale | Anglais |
|---|---|
| Pages (de - à) | 127-148 |
| Nombre de pages | 22 |
| Revue | International Journal of Operational Research |
| Volume | 27 |
| Numéro de publication | 1-2 |
| Les DOIs | |
| État | Publié - 2016 |
| Modification externe | Oui |
Classification disciplinaire ASJC Scopus
- Sciences de la gestion et recherche opérationnelle
Empreinte digitale
Voici les principaux termes ou expressions associés à « Scheduling of multiple projects with constrained resources and preemption ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver