Scheduling of multiple projects with constrained resources and preemption

  • Universidad de la Sabana

Résultats de recherche: Contribution à un journal › Article publié dans une revue, révisé par les pairs › Revue par des pairs

Résumé

The resource-constrained (single) project scheduling problem has been widely studied in literature. A common assumption in its basic version is that the execution of activities cannot be interrupted, that is activities are non-preemptable. Very little effort has been made to analyse the impact of activity preemption. In addition, classical project scheduling models only consider the case of a single project. This paper considers the problem of scheduling multiple projects under the assumption of activities preemption. A heuristic algorithm is proposed and its performance is analysed using several well-known priority rules. Computational experiments are carried out using the well-known datasets from the PSP Library. Results show the advantages of incorporating activity preemption when scheduling multiple projects.

Langue originaleAnglais
Pages (de - à)127-148
Nombre de pages22
RevueInternational Journal of Operational Research
Volume27
Numéro de publication1-2
Les DOIs
ÉtatPublié - 2016
Modification externeOui

Classification disciplinaire ASJC Scopus

  • Sciences de la gestion et recherche opérationnelle

Empreinte digitale

Voici les principaux termes ou expressions associés à « Scheduling of multiple projects with constrained resources and preemption ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.

Citer cette ressource