Abstract
This paper studies the problem of production scheduling in a company belonging to the apparel industry, where textile labels are manufactured through the process of thermal transfer. The problem is modelled as a flexible flowshop with two stages. The objectives are the maximisation of system productivity (or minimisation of makespan) and the minimisation of the number of production orders with late delivery. This paper proposes a scheduling procedure based on a bi-objective genetic algorithm. An experimental study was performed using real data from the enterprise. Since validation results showed the efficiency and effectiveness of the proposed procedure, a decision-aid tool is designed. The algorithm is implemented at the enterprise and allows improved key performance metrics.
| Original language | English |
|---|---|
| Pages (from-to) | 42-60 |
| Number of pages | 19 |
| Journal | International Journal of Information Systems and Supply Chain Management |
| Volume | 4 |
| Issue number | 2 |
| DOIs | |
| Publication status | Published - Apr 2011 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Apparel industry
- Genetic algorithm
- Makespan
- Scheduling
- Tardy jobs
ASJC Scopus subject areas
- Management Information Systems
- Information Systems
Fingerprint
Dive into the research topics of 'Solving a bi-criteria hybrid flowshop scheduling problem occurring in apparel manufacturing'. These topics are generated from the title and abstract of the publication. Together, they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver