Résumé
This paper studies the problem of production scheduling in a company belonging to the apparel industry, where textile labels are manufactured through the process of thermal transfer. The problem is modelled as a flexible flowshop with two stages. The objectives are the maximisation of system productivity (or minimisation of makespan) and the minimisation of the number of production orders with late delivery. This paper proposes a scheduling procedure based on a bi-objective genetic algorithm. An experimental study was performed using real data from the enterprise. Since validation results showed the efficiency and effectiveness of the proposed procedure, a decision-aid tool is designed. The algorithm is implemented at the enterprise and allows improved key performance metrics.
| Langue originale | Anglais |
|---|---|
| Pages (de - à) | 42-60 |
| Nombre de pages | 19 |
| Revue | International Journal of Information Systems and Supply Chain Management |
| Volume | 4 |
| Numéro de publication | 2 |
| Les DOIs | |
| État | Publié - avr. 2011 |
| Modification externe | Oui |
SDG des Nations Unies
Ce résultat contribue à ou aux Objectifs de développement durable suivants
-
SDG 9 – Industrie, innovation et infrastructure
Classification disciplinaire ASJC Scopus
- Systèmes d'information de gestion
- Systèmes d'information
Empreinte digitale
Voici les principaux termes ou expressions associés à « Solving a bi-criteria hybrid flowshop scheduling problem occurring in apparel manufacturing ». Ces libellés thématiques sont générés à partir du titre et du résumé de la publication. Ensemble, ils forment une empreinte digitale unique.Citer cette ressource
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver